Level measurement in the trip tank

Level measurement in the trip tank

Share:


Level measurement in the trip tank



Trip tank

Level measurement in the trip tank

Level measurement in the trip tank
 

Process data

Measuring task
Level measurement
Measuring point
Tank
Measuring range up to
10 m
Medium
Contaminated mud (drilling mud)
Process temperature
0 … +90 °C
Process pressure
0 … 0 bar
Special challenges
Different mud compositions, strong abrasion

Application

The drilling mud flowing back under high pressure from the drilling well is held and monitored in the trip tank. This drilling mud is contaminated with sea water, rocks and sand. In addition to materials like rocks and sand, residues of oil and gas are also present. The built-in level measuring system provides feedback about down-well conditions, basic data for comparing the quantity of drilling mud fed into the wellbore with that returned, as well as regulating mud production.

Your benefit

Reliable
Reliable measurement, independent of the characteristics of the drilling mud
Cost effective
Maintenance-free and accurate determination of mud usage
User friendly
Simple installation and setup
 


 Inquiry - Level measurement in the trip tank