VG Instruments (SEA) Sdn Bhd
12A, Jalan Dagang SD2/1G,
Bandar Sri Damansara,
Kepong, 52200
Kuala Lumpur, Malaysia.
+603-6276 8363
+603-6276 9363

Level measurement at the reservoir

Previous 14 / 57 Next

Level measurement at the reservoir Energy Vega Innovation


Reservoir at the pumped storage power plant

Level measurement at the reservoir

Reservoir level measurement
Hydrostatic
Reservoir level measurement
Radar

Process data

Measuring task
Level measurement
Measuring point
Basin, reservoir
Measuring range up to
70 m
Medium
Water
Process temperature
0 … +25 °C
Process pressure
0 … 0 bar
Features
Wind, weather, temperature changes, ice formation

Application

Pumped storage power plants store a large amount of energy and feed it into the grid very quickly when necessary. One important parameter is the height of the water level in the reservoir. It allows calculations to be made about the amount of energy available and the existing storage volume in pump operation mode. High reliability is required from the measurement technology deployed, because the sensors are often mounted at very remote locations.

Your benefit

Reliable
Ensures reliable efficient, optimal operation of the hydroelectric plant
Cost effective
Maintenance-free measurement
User friendly
Simple installation on existing structures


Please leave your enquiry here, we will reply as soon as possible.
Name*  
Company Name  
Product Interested  
Quantity  
Email*  
Contact No.*  
Ship to Name  
Shipping Address  
Messages*  
   

Switch to Mobile Version
available in